Technical points of air duct production
1。空调通风管道系统均为高压和中压系统,其中度N1级至N5级为高压系统,N6级至N9级为中压系统。
1. The air conditioning and ventilation duct systems are both high-pressure and medium pressure systems, with N1 to N5 grades being high-pressure systems and N6 to N9 grades being medium pressure systems.
2。风管及部件的制作应在相对封闭和清洁的环境中进行,地面应铺橡胶板或其他防护材料。加工风管的板材,在下料前应进行清洗,洗后应立即擦干。加工过程应有措施保证不二次污染。加工型线  流水槽模具 景观石 检查井钢模具 保定通风管道 隔离墩模具 保定保洁公司镀锌 钢板风管应避免损坏镀锌层,如有损坏应做防腐处理。
2. The production of air ducts and components should be carried out in a relatively closed and clean environment, and the ground should be covered with rubber sheets or other protective materials. The boards for processing air ducts should be cleaned before cutting and immediately wiped dry after washing. Measures should be taken during the processing to ensure no secondary pollution. The processing of galvanized steel sheet air ducts should avoid damaging the galvanized layer, and if there is any damage, anti-corrosion treatment should be carried out.
3。风管不得有横向接缝,尽量减少纵向拼接缝。矩形风管边长不大于800mm时,不得有纵向接缝,
3. The air duct shall not have transverse joints and longitudinal joints shall be minimized as much as possible. When the side length of a rectangular air duct is not greater than 800mm, there shall be no longitudinal joints,
4。风管及部件制作完成后,用无腐蚀性清洗液将内表面清晰干净,干燥后经检查达到要求即进行封口,安装前再拆除封口。清洗后立即安装的可不封口。
4. After the production of the air duct and components is completed, the inner surface is cleaned with a non corrosive cleaning solution. After drying, it is inspected and meets the requirements before sealing. Before installation, the sealing is removed. Install immediately after cleaning without sealing.      